19.6 C
Hamburg
Friday, July 12, 2024
Home Rates & Surcharges CMA CGM revises peak season surcharge from Europe to North America

CMA CGM revises peak season surcharge from Europe to North America

Marseille-headquartered container line CMA CGM has announced the revision of its peak season surcharge (PSS) from Europe to US Gulf, US East Coast and Canada East Coast.

The new surcharge from North Europe, Scandinavia, Poland and Baltic to US East Coast will be effective from 20 December (US gate in date) until further notice and will be US$1,500 per container for all types of cargo.

CMA CGM said the peak season surcharge from Portugal to US East Coast remains at US$1,375 per 20' and US$1,550 per 40'.

The surcharge from North Europe, Scandinavia, Poland and Baltic to US Gulf and Canada East Coast will also be effective from 20 December (US gate in date) until further notice and will be US$1,750 per 20' and US$2,000 per 40' for all types of cargo.





Latest Posts

California backs POLB’s Supply Chain Information Highway

The Port of Long Beach's comprehensive digital platform, the Supply Chain Information Highway, designed to expedite cargo deliveries nationwide, is receiving significant funding from...

Wärtsilä simulators to aid Wavelink Maritime Institute in sustainable fuel training

Wärtsilä has provided its latest dual-fuel engine simulator technology to Wavelink Maritime Institute (WMI), the training division of the Singapore Maritime Officer’s Union (SMOU). These...

Maersk Air Cargo becomes first Danish airline with Boeing 777

Maersk Air Cargo (MAC), operating under A.P. Moller–Maersk, received its first of two new Boeing 777F aircraft, marking a historic milestone as the first...

NCL backs ammonia power with vessel orders

Norwegian regional operator North Sea Container Lines (NCL), which already ordered an ammonia powered vessel at the end of last year, has ordered a...

APM Terminals Mumbai shifts to 80% renewable electricity

APM Terminals Mumbai (GTI) has transitioned to 80% renewable electricity this month by commissioning a 10.65 MW captive solar power plant under a Power...