Friday, June 20, 2025
Home Port News Contract for issue of Maasvlakte 2 site

Contract for issue of Maasvlakte 2 site

Locomotive Workshop Rotterdam (LWR), a joint venture from Siemens Mobility and Mitsui Rail Capital Europe (MRCE), has signed an agreement with the Port of Rotterdam Authority for the issue and development of a site on Maasvlakte 2. A workshop will be realised on this site to enable railway companies to carry out the required maintenance on their locomotives.

LWR will have the ground lease for the land as of 1 September 2018, when construction of the workshop will commence. The workshop on Maasvlakte 2 will be part of a European network of maintenance workshops.

The Port of Rotterdam, particularly Maasvlakte 2, is an ideal location for the maintenance of locomotives that arrive there from across Europe. This means that long-term movements of locomotives for maintenance is no longer necessary, which saves time and money. As largest sea port in Europe, Rotterdam is the logistics access gateway to the European railway network. The port is the start and end point of over 250 weekly intermodal rail transport services. This workshop will optimise the coordination of rail transport and servicing.

The joint aim of the Port of Rotterdam Authority and LWR to minimise the CO2 footprint will be realised via solar roof panels, which will provide 50% of the site’s energy requirements.





Latest Posts

Oil slick forming after two-tanker collision in Oman gulf

Greenpeace Middle East and North Africa (MENA) has warned of a potential environmental disaster after two crude oil tankers collided between Iran and the...

Shipsgo at Transport Logistic 2025

Held at Messe München from June 2-5, Transport Logistic 2025 is a global exhibition for logistics and supply chain management, information technologies, and mobility....

MICT becomes first Philippine terminal to deploy fully electric tractors

Manila International Container Terminal (MICT), the flagship facility of International Container Terminal Services, Inc. (ICTSI), introduced two fully electric terminal tractors into its operations,...

Port of Los Angeles completes major wharf restoration project

Port of Los Angeles has wrapped up a US$22.7 million restoration project at Berths 177-182, significantly upgrading its infrastructure along the East Basin Channel...

Antong splashes out on new containers after abandoning Sinolines takeover

Antong Holdings, which owns Chinese liner operator Quanzhou Ansheng Shipping, has announced it will spend US$165 million to buy new containers, citing growth in the domestic...
error: Content is protected !!