Thursday, June 26, 2025
Home Port News ABP submits plans for UK’s largest floating solar project at Barrow

ABP submits plans for UK’s largest floating solar project at Barrow

Associated British Ports (ABP), one of the UK’s leading port operators, has taken a major step in its vision for the Port of Barrow by submitting a planning application for the country’s largest floating solar project, Barrow EnergyDock.

This marks a key milestone in ABP’s broader Masterplan, launched last September, aimed at fostering growth and strengthening the local economy.

Set to be installed in Cavendish Dock, Barrow EnergyDock will significantly expand green energy capacity, particularly for Barrow’s advanced engineering sector. The floating solar array will generate up to 40MWp, enough to power approximately 14,000 homes annually. By supplying renewable energy directly to the port’s advanced manufacturing sector, the project aims to stabilize electricity costs while promoting sustainability.

The solar panels will be mounted on floating pontoons, optimally angled for energy generation, and secured by an anchoring system. The array will cover about one-third of the dock’s surface, consisting of approximately 47,000 panels. Existing leisure activities will continue, with potential for future expansion.

By opting for floating solar rather than land-based installations, ABP ensures that valuable port space remains available for operations and manufacturing, preserving jobs and economic opportunities.

Bryan Davies, Divisional Port Manager (Northwest and Scotland), ABP, commented: “We’re excited to see the planning application submitted for Barrow EnergyDock and to see the first element of ABP’s Port of Barrow Masterplan start to take shape. ABP’s masterplanning team worked with the local Barrow team to design a Masterplan focussed on driving growth and strengthening the local economy in response to the significant investment coming to the region over the next ten to twenty years. Barrow EnergyDock is a pivotal step in realising our vision for a prosperous and sustainable future for Barrow.”

To support the planning process, ABP partnered with Green Cat Renewables, an environmental and engineering consultancy, and conducted two public consultations last autumn to engage with the local community. Additionally, ABP’s marine consultancy, ABPmer, carried out marine ecology and coastal waterbird surveys, with findings indicating no significant environmental impacts.

Kirsten Abbott, Group Commercial Manager (Energy) at ABP stated: “We are thrilled to be submitting the planning application for the Barrow EnergyDock, which is a testament to ABP’s commitment to sustainability and innovation. It aligns with the goals set out in ABP’s sustainability strategy – Ready for Tomorrow – and represents a significant step towards a greener future for the Port.”





Latest Posts

Maersk unveils “Trade & Tariff Studio” to simplify customs management

Maersk has launched Maersk Trade & Tariff Studio, an AI-driven customs-management platform. Lars Karlsson, Global Head of Trade & Customs Consulting at Maersk stated that...

Solstad renews partnership with Marlink

Solstad has renewed its long-standing partnership with Marlink to advance its digitalization strategy through to 2028. Under the new agreement, Marlink will deliver SealinkNextGen, a...

KEZAD and Witthal Gulf Industries sign deal to launch recycling plant

Khalifa Economic Zones Abu Dhabi Group has signed a 50-year land lease agreement with Witthal Gulf Industries for the establishment of the country’s first...

Emirates Shipping Line announces new service to Seattle

Emirates Shipping Line has announced its entry into the United States market with the launch of the Sun Chief Express service, a direct, fortnightly...

Port of Long Beach approves $833 million budget

The Long Beach Board of Harbor Commissioners has approved an $833 million budget for fiscal year 2026, nearly half of which will go toward...
error: Content is protected !!